GÜRİŞ HAS PURCHASED 25.78 MW ÇERMİKLER HYDROELECTRIC POWER PLANT.

Çermikler HEPP, located in Sıvas city, has an installed capacity of 25.78 MW and is generating 80.651.000 kWh of electricity annually. In other words Çermikler HEPP meets the needs of monthly electricity of 27.000 houses. With this new investment, the number of hydroelectric power plants that GÜRİŞ owns becomes six and the total installed capacity of hydroelectric power plant investments rises to 104.38 MW.