Espiye HEPP, located in Giresun city, has an installed capacity of 14.07 MW and is generating 57.500.000 kWh of electricity annually. In other words Espiye HEPP meets the needs of monthly electricity of 20.000 houses.
With this new investment, the number of hydroelectric power plants that GÜRİŞ owns becomes five and the total installed capacity of hydroelectric power plant investments rises to 78.6 MW.