AIR ENERGY SH.P.K

KITKA Wind Power Plant under construction in Kosovo will have an installed capacity of 32.4 MW and will generate 95.600.000 kWh electricity annually.

9 units of GE 3.6 - 137 turbines with a hub height of 110 m and a blade diameter of 137 m will generate in the plant and the plant is planned to be completed on August 31, 2018.

 